Skip to main content

Release notes - 22 January 2025

ยท One min read
Liam Collins

These changes have been deployed to Demo and UAT environments and are scheduled to be deployed to production on 27 January 2025.

Master Routingโ€‹

Addedโ€‹

  • If the visit days for an order which is already planned on a master route in MRM are changed to new days. The visit will be removed from the route on the old visit day and returned to the unplanned visit this. This is to ensure visits are always planned on valid routes.

Fixedโ€‹

  • Fixed issues with company outlet slider on master route editor not displaying correctly in some cases.
  • Fixed bug where MRM would show "Application setting error" when MRM was opening for a long time.
  • Fixed issue the allowed material not syncing correctly to the ERP route template.
  • Fixed issue with allowed materials sync to ERP with master route which has allowed materials before a recent change.