Skip to main content

Release notes - 25 November 2024

ยท One min read
Liam Collins

These changes have been deployed to Demo and UAT environments and are scheduled to be deployed to production on 28 November 2024.

Master Routingโ€‹

Fixedโ€‹

  • Fixed issue with duplicate sites routing in the route editing screen.
  • Fixed issue with Master Route edit dialog selecting the first vehicle for a vehicle type
  • Fixed issue with mismatched sequence optimisation results and route KPIs

Master Routing to ERP Connectorโ€‹

Fixedโ€‹

  • Fixed issue with materials not syncing correctly to MRM if there were more than 200 materials.
  • Fixed issue with order not being planned on a master route when the route was selected in the ERP CSR screens.