Skip to main content

Release notes - 19 Jan 2024

ยท One min read
Liam Collins

These changes have been deployed to Demo and UAT environments and are scheduled to be deployed to production on 19 January 2024.

Master Routingโ€‹

Addedโ€‹

  • We now support multi drag-dropping when using the lasso select on the map.
  • If a route stop count exceeds 2000 stops, a trace is no longer shown on the map to avoid showing a confusing trace.
  • Open and Closing the master route view no longer causes the planning view to fully reload.

Fixedโ€‹

  • Fixed issue with text overlapping on smaller screen sizes.

MRM to ERP Connectorโ€‹

Addedโ€‹

  • MRM is no longer added to the start of the route name when syncing to ERP.